Magnum Long Lead EDC

Excl. VAT - 142,65 lei
169,75 lei

Available on backorder (shipping in 2-7 weeks)

Brand:

Description

The Magnum Long Lead EDC is a classic gentleman’s and gourmet pocket knife for everyday use. Its simple, slightly curved design is instantly appealing. The no-frills design also corresponds to its technical construction as a slip-joint knife, which has proven itself a million times over thanks to its ease of use and fewer components. The satin-finished blade made of 8Cr13MoV stainless steel is flat-ground, is opened by nail nick and does not lock. The lightly contoured handle scales made of textured G10 fit comfortably in the hand. With clip (tip-down/r).

Additional information

Weight 0,078 kg
Dimensions 18,4 cm
Brand

Blade Length

Blade Thickness

Blade Material

Handle Material

Locking mechanism

Blade Color

EAN

4045011226663

Opener

Opening

Country Of Origin

Reviews

There are no reviews yet.

Be the first to review “Magnum Long Lead EDC”

Your email address will not be published. Required fields are marked *